A Google Sheets content calendar needs one row per post and columns for date, network, format, topic, caption, asset link, owner and status. Add a status dropdown with colors for draft, in review, approved and scheduled. It works well for one or two brands and starts to strain once approvals and many clients arrive.
Make a sheet where each row is a single post on a single network. A row for a post that goes to three networks becomes three rows, which keeps filtering simple.
Freeze the top row, and keep a separate tab for each client so a mistake in one brand's sheet never touches another's.
Plan the month in one sitting using the topic column to balance themes. Draft a week ahead, send posts for review early in the week and schedule once approved.
Use conditional formatting to highlight rows where the date is within two days and the status is not yet approved. That single rule catches most late posts.
Sheets are free and flexible, but the cracks appear as you grow.
If you are copying captions out of a sheet into a scheduler every week, that is the signal. Request a workspace at /start/, load each client's voice and bring the calendar across. Keep the sheet for planning if you like it, and let publishing happen from one place.